The main purpose of the fuses and breakers are to protect the wiring.
Backfeed breaker solar.
Article 690 requirements apply to solar pv systems.
If a 200 a busbar has a 200 a main breaker the code allows adding a up to a 40 a backfeed breaker.
Then looking at that photo again you can see i have a 30a 2 pole breaker at the other end for my solar inverter.
In my case i have 1 6kw solar but 9 6kwh golf battery system it will never get fully charged unless i choose so.
When setting up a generator to backfeed your house power can be pushed out through the main breaker to the transformer and cause unexpected high voltage.
The problem is the backfeeding only happens when battery is fully charged.
Nec705 12 b 2 3 b states that where there are two power sources the grid and the solar inverter the sum of their breakers cannot equal more than 120 of the busbar rating of the breaker box.
The sizing of back feed breakers is another point of difficulty.
Circuit requirements are outlined in part ii of this article.
As noted in sec.
From there you d land your inverter s output into a 50a breaker and your done.
The transfer switch or interlocked backfeed breaker acts to prevent the connection of the generator while the main breaker for the panel is closed.
According to the manual backfeeding is a real grid tie system once the grid is off the backfeeding stops.
Energizing wiring systems far from your setup like this can damage your equipment and the appliances being powered as well as potential for electrocution to technicians repairing power lines.
The nec allows adding a back feed breaker so that the current supply is up to 120 of the rating of the bus bar.
690 10 e plug in type back fed circuit breakers connected to a stand alone inverter output in either stand alone or utility interactive systems shall be secured in accordance with 408 36 d.